简体 English
返回
 ${ele.title}
 ${ele.title}
 ${ele.title}
 ${ele.title}

Plastic PP Material Goblet Mould

Plastic PP Material Goblet Mould work full automatic on 320ton injection moulding machine
Details

Spec. for this PP material Standing cup mould

Mold Item PP material Standing cup mould
Mold steel

718H for core and cavity plate

H13 for sliders

C50 for mould base

Mold gate way Cold runner system
Mold doff system

Oil cylinders for the slider move out

Stripper plate for cup doff

Mold cycle time 40'/shot
Mold leading time 50 work days for T0

 

This PP material Standing cup mould sample photo shown

We will offer 2 times samples for free.

 

The normal work step will like this list

1. Your side send the sample or drawing idea to us, meantime, we send the PI to you, depend on our PI that you can arrange deposit to us as down-payment;

2. We received the sample & down-payment, then we will double check every details with you & begin to arrange design, after finished design we will send the drawing file to you for double check;

3. Both of us confirmed the design for the new visors then we will begin to make mould design;

4. On normal we need 3 -4 days for  visor design, and 3 days for visor mould design, both of the design files will send to you for double check, if you have any demands we will arrange repair as your require;

5. After everything confirmed then we will begin to order steel and process, when arrange process, every week i will send some update process photos shown to you, on normal need about 40 days;

6. After finished mould process we will arrange first time test and check new sample with your helmet sample, if that is good, then we will arrange sample to you by TNT;

7. After your side also confirmed sample, then we will arrange final polish and mould surface treatment, on normal need 7-10 days at most.

8. Everything finished we will arrange last time test for the mould, if you will visit china, then we will shown test to you, if you won’t come to china, then we will send last time sample & test mould video to you check.

9. After everything confirmed by your side then your company need arrange balance to us, after we got balance then we will arrange shipment for the mould.

Keyword:
PP Goblet mold
stand cup mould
cup moulding
plastic glass mold

CONTACT INFO

Linda

Mobile:+86-13586005286
Tel:+86-576-84796888
E-mail:lindazou@188.com
WhatsApp:008613586005286

Nora

Mobile:+86-18858665677
E-mail:Nora@chinese-mould.com

Copyright © 2022 Taizhou OSKAI Mould Factory 浙ICP备09086439号 Powered by 300.cn

WRITE A MESSAGE TO US

Online Inquiry

验证码